Don't take our word for anything
Every claim on this site can be checked — most of them in one visit. This page is the checklist. Boring, in the best sense.
Audit us unannounced
Any terminal, any order, drawing to delivery note — unescorted. No presentation survives that; no honest system fails it. The invitation stands, is meant, and is repeated at every stage of working with us.
Arrange your visit — or don't arrange it. That's the point.
Verifiable numbers, not logos
Check every certificate against the issuing body's registry — the registry number is stated on the card, not hidden in the PDF.
Prototype note: download cards are placeholders; live PDFs and registry numbers drop in when supplied.
Welding coordination — a named engineer, not a department
Welding quality at Platt is coordinated by a qualified International Welding Engineer (IWE), named in our credibility pack. The welder matrix — with qualification expiry dates — travels with every first quotation, before you ask for it.
Our books are public. We point at them.
Hungarian company accounts are filed and public. We lead with ours — 22 years of family ownership, self-funded investment, zero ownership changes. A supplier who shows you the books unprompted is telling you something.
Filed accounts: Platt 2003 Kft. — via the Hungarian e-beszamolo registry (link in production build).
The six smart-factory claims — and how to check each one
And one more: a clean nonconformity log is the biggest red flag in auditing. Ask for our real NC/8D summary — real factories find problems.
Start with the documents, finish with the visit
Request the credibility pack: certificates, welding-coordinator qualification, welder matrix, a traceability sample and the current NC/8D summary — sent with the first quote.
